The company’s €100 million green energy investment programme has positioned NEPI Rockcastle as the leading producer of solar power outside the energy sector across Central and Eastern Europe (CEE) markets.
The Ariceștii Rahtivani (Nedelea) park in Prahova County is located on a 75.5 hectare former mineral aggregate extraction site and has an installed capacity of 56.2 MW, which will generate some 73,000 MWh of energy per year, equivalent to the annual consumption of over 40,000 Romanian households. The facility is in the upper-tier of mid-sized solar energy production parks and will prevent the emission of some 17,000 tonnes of CO₂ annually.

Andrei Radu, NEPI Rockcastle’ Group Development Director said: “Strategically the green energy program makes a lot of sense. By the end of this year, we will be generating some 31% our total electricity needs – a significant step up from 6% two years ago. This investment improves the efficiency and resilience of our portfolio, while helping our tenants to operate sustainably and protect the communities and ecosystems surrounding our shopping centers.”
The photovoltaic park has given new economic utility to previously degraded and unproductive land and the areas between the rows of solar panels is being used as pasture for the grazing of sheep by local farmers – an ecological solution for vegetation management that directly supports the rural economy in the area. The project has been designed with a long-term vision: the existing infrastructure, which includes its own transformer station, allows for future expansion through the integration of battery energy storage systems (BESS).
The park was developed in partnership with Global Technical Systems.
(dp)


